So the 2nd floor bathroom is well on its way. Wallpaper stripping is complete, architectural ceiling block is built, cracks and holes are spackled, walls sanded, tiles caulked. We picked out a royal blue for the paint and just have the tub after that. Here are my inspiration photos to give you an idea although this tub isn't claw-foot and ours will be blue.
Upstairs, we'll be redoing the claw-foot when we attack our master bedroom/bathroom combo in phase II of construction late next year. For now, I'll just day dream when i see some of these bathrooms.
I love how they tied the sink into the color scheme as well, but may be too matchy-matchy for me |
No comments:
Post a Comment